A platform for research: civil engineering, architecture and urbanism
Present stage of construction; automatic removing of gravel in intake structure; 160 m high arch and buttress dam structures are joined to each other; 15 ft diam 7.7 mi long pressure tunnel is partly sheet-lined; penstocks are under pressure of 4000 ft head; underground powerhouse consists of two parallel chambers.
Present stage of construction; automatic removing of gravel in intake structure; 160 m high arch and buttress dam structures are joined to each other; 15 ft diam 7.7 mi long pressure tunnel is partly sheet-lined; penstocks are under pressure of 4000 ft head; underground powerhouse consists of two parallel chambers.
Roselend hydroelectric power plant
L'amenagement hydroelectrique de Roseland
Pousse, L. (author)
1960
30 pages
1 Plate
Report
French
© Metadata Copyright Elsevier B. V. All rights reserved.