A platform for research: civil engineering, architecture and urbanism
International Petroleum Co, Ltd, constructed number of employee houses in Talara, Peru, with masonry walls, flat concrete roofs, and spread footings; some of these were built in area underlain by veins of clay; damages caused by uplift pressure of expansive clay; corrective measures consisted of placing asphalt pavement and French drain around house.
International Petroleum Co, Ltd, constructed number of employee houses in Talara, Peru, with masonry walls, flat concrete roofs, and spread footings; some of these were built in area underlain by veins of clay; damages caused by uplift pressure of expansive clay; corrective measures consisted of placing asphalt pavement and French drain around house.
Experience with expansive clay in Peru
Civ Eng (NY)
Clark, F.D. (author)
1960
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Consolidation and Permeability of Clay Minerals-Expansive to Non-Expansive
British Library Conference Proceedings | 2011
|Expansive Clay Minerals and Hurricane Katrina
ASCE | 2013
|Cyclic Behavior of Reinforced Expansive Clay
British Library Online Contents | 2000
|Treatment of Expansive Clay Canal Lining
NTIS | 1984
|