A platform for research: civil engineering, architecture and urbanism
Prototype tests of spillway crest and flip bucket, pine flat dam, kings river, California
During construction of 440 ft high structure, complete piezometer system and air-demand measuring facilities were installed in spillway and outlet works; pressures measured compared closely with previous model tests; trajectory of prototype flip-bucket jet was observed, and its horizontal throw was less than that measured in model or that indicated by theoretical calculations.
Prototype tests of spillway crest and flip bucket, pine flat dam, kings river, California
During construction of 440 ft high structure, complete piezometer system and air-demand measuring facilities were installed in spillway and outlet works; pressures measured compared closely with previous model tests; trajectory of prototype flip-bucket jet was observed, and its horizontal throw was less than that measured in model or that indicated by theoretical calculations.
Prototype tests of spillway crest and flip bucket, pine flat dam, kings river, California
US Waterways Experiment Station -- Tech Report
Dawsey, J.V. (author)
1959
12 pages
Report
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Spillway and conduits for pine flat dam Kings River, California
Engineering Index Backfile | 1953
Flow through spillway flip bucket
Engineering Index Backfile | 1969
|Flow Through Spillway Flip Bucket
ASCE | 2021
|Sluice outlet portal and spillway flip bucket, Hartwell Dam, Savannah River, Georgia
Engineering Index Backfile | 1954