A platform for research: civil engineering, architecture and urbanism
Dynamite shoots rock and soil, dredges dig whole canal
Construction of 4 mi shipping canal near Stockholm, Sweden; removal of 5 million yd of earth and 260,000 yd of rock; overburden and bedrock were blasted at same time; biggest blast on job comprised 4750 holes and used 12,000 caps and 123,000 lb of dynamite; after blasting, excavation became dredging operation.
Dynamite shoots rock and soil, dredges dig whole canal
Construction of 4 mi shipping canal near Stockholm, Sweden; removal of 5 million yd of earth and 260,000 yd of rock; overburden and bedrock were blasted at same time; biggest blast on job comprised 4750 holes and used 12,000 caps and 123,000 lb of dynamite; after blasting, excavation became dredging operation.
Dynamite shoots rock and soil, dredges dig whole canal
Construction Methods Equipment
1959
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Drills, dredges and dynamite used by contractors to build highway across the Everglades
Engineering Index Backfile | 1928
Hercules dredges for the Panama Canal
Engineering Index Backfile | 1883
Engineering Index Backfile | 1889
Formulas for using dynamite in canal excavation
Engineering Index Backfile | 1933
|Delivery dredges for the Leeds and Liverpool canal
Engineering Index Backfile | 1893