A platform for research: civil engineering, architecture and urbanism
"Operation Spark" -- Example of construction of buildings by industrial methods
By new French method, superstructure of 5-story building, including inside facing of walls, was completed in 9 days, by using heavy precast panels; 3 days later central heating of building was in operation; on 24th day from start, tenants moved in.
"Operation Spark" -- Example of construction of buildings by industrial methods
By new French method, superstructure of 5-story building, including inside facing of walls, was completed in 9 days, by using heavy precast panels; 3 days later central heating of building was in operation; on 24th day from start, tenants moved in.
"Operation Spark" -- Example of construction of buildings by industrial methods
L'operation "Etincelle". Exemple de construction de batiments suivant les methodes industrielles
Fougea, E. (author)
Travaux ; 44
1960
7 pages
Article (Journal)
French
© Metadata Copyright Elsevier B. V. All rights reserved.
Materials and methods of construction for industrial buildings
Engineering Index Backfile | 1909
|Modern construction for industrial buildings
Engineering Index Backfile | 1949
|Industrial Construction Methods for Cost-Effective and Sustainable Multi-Storey Buildings
BASE | 2008
|Industrialised Method of Construction for Industrial Buildings
British Library Conference Proceedings | 1991
|The design and construction of industrial buildings
Engineering Index Backfile | 1907
|