A platform for research: civil engineering, architecture and urbanism
Two level scaffolding holds deck forms
Part of extensive work being done on approach to George Washington Bridge, in New York City, is scaffolding system that cantilevers from columns of sides of bridge, serving as work platform and supporting deck forms; placing of reinforcing steel into first level of scaffold; crew chutes concrete directly into form.
Two level scaffolding holds deck forms
Part of extensive work being done on approach to George Washington Bridge, in New York City, is scaffolding system that cantilevers from columns of sides of bridge, serving as work platform and supporting deck forms; placing of reinforcing steel into first level of scaffold; crew chutes concrete directly into form.
Two level scaffolding holds deck forms
Construction Methods Equipment
1960
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
A scaffolding deck, deck element and components therefor
European Patent Office | 2022
|A SCAFFOLDING DECK, DECK ELEMENT AND COMPONENTS THEREFOR
European Patent Office | 2021
|Forms, scaffolding, and trestle bridges
Engineering Index Backfile | 1951
|SUPPORTS FOR WORK DECK OF SYSTEM SCAFFOLDING OR SYSTEM SUPPORT
European Patent Office | 2024
|