A platform for research: civil engineering, architecture and urbanism
Hammerhead piers carry turnpike bridge
Total of 100 of hammerhead piers carries 4182 ft long bridge over James River at Richmond, Va; river portion of bridge comprises 88 ft long simple beam steel composite spans; 96 and 115 ft girder spans used in overland portion; reinforced concrete deck consists of two 40 ft roadways separated by 4 ft mall; columns for hammerhead piers are of 7 ft 9 in. diam; foundations were placed under water in steel sheetpile cofferdams.
Hammerhead piers carry turnpike bridge
Total of 100 of hammerhead piers carries 4182 ft long bridge over James River at Richmond, Va; river portion of bridge comprises 88 ft long simple beam steel composite spans; 96 and 115 ft girder spans used in overland portion; reinforced concrete deck consists of two 40 ft roadways separated by 4 ft mall; columns for hammerhead piers are of 7 ft 9 in. diam; foundations were placed under water in steel sheetpile cofferdams.
Hammerhead piers carry turnpike bridge
Civ Eng (NY)
Steinman, D.B. (author) / Gronquist, C.H. (author)
1959
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Fatigue Reliability of Hammerhead Bridge Piers
ASCE | 2013
|Fatigue Reliability of Hammerhead Bridge Piers
British Library Online Contents | 2014
|Cracking Mechanism and Strengthen Method of Reinforced Concrete Hammerhead Piers
British Library Conference Proceedings | 2013
|Engineering Index Backfile | 1893
|Engineering Index Backfile | 1926
|