A platform for research: civil engineering, architecture and urbanism
164 ft long, 54 in. diam prestressed concrete cylinder piles, precast pile bent caps, and precast prestressed deck units spanning 60 ft, weighing about 156 tons each, for construction of 3 mi long 60 ft wide bridge, were transported on barges from casting yard at Mandeville, La; most of bridge length is made up of two 6700 ft long concrete trestles; three spans, 123, 154, and 123 ft long, are of continuous welded steel plate girders; two 900 ft long sections of trestle are on 4% grade.
164 ft long, 54 in. diam prestressed concrete cylinder piles, precast pile bent caps, and precast prestressed deck units spanning 60 ft, weighing about 156 tons each, for construction of 3 mi long 60 ft wide bridge, were transported on barges from casting yard at Mandeville, La; most of bridge length is made up of two 6700 ft long concrete trestles; three spans, 123, 154, and 123 ft long, are of continuous welded steel plate girders; two 900 ft long sections of trestle are on 4% grade.
Florida spans: made in Louisiana
Eng News -- Rec
Dean, W.E. (author)
Engineering News-Record ; 165
1960
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Characteristics of the rust from weathering steels in Louisiana bridge spans
Tema Archive | 1986
|Hinged spans for rarely opened bridges over Florida drainage canals
Engineering Index Backfile | 1953
|Convert old fixed spans into vertical lift spans
Engineering Index Backfile | 1934
Engineering Index Backfile | 1961
|Dynamic response of pipeline in long free spans or multi-spans
British Library Conference Proceedings | 2005
|