A platform for research: civil engineering, architecture and urbanism
Prestressed concrete beams and precast piers in New Laira Bridge
New bridge, replacing one built in 1824, comprises five prestressed girder spans 108 ft long each, carrying two 22 ft wide lanes; cylindrical prestressed concrete piers with precast top and bottom blocks extend to bedrock by penetrating 90 ft of mud; 14 longitudinal girders in each span are prestressed by 12 wire cables; 8 in. thick deck slab is cast over girders.
Prestressed concrete beams and precast piers in New Laira Bridge
New bridge, replacing one built in 1824, comprises five prestressed girder spans 108 ft long each, carrying two 22 ft wide lanes; cylindrical prestressed concrete piers with precast top and bottom blocks extend to bedrock by penetrating 90 ft of mud; 14 longitudinal girders in each span are prestressed by 12 wire cables; 8 in. thick deck slab is cast over girders.
Prestressed concrete beams and precast piers in New Laira Bridge
Surveyor
Hutton, D.M. (author) / Westwood, F.T. (author) / Cliffe, A.P. (author)
Surveyor ; 119
1960
5 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Nonlinear finite element analysis of precast segmental prestressed concrete bridge piers
British Library Conference Proceedings | 2008
|Precast prestressed concrete rail bridge
Engineering Index Backfile | 1947
Precast prestressed concrete rail bridge
Engineering Index Backfile | 1947
Precast Concrete Segmental Bridge Piers under Ship Impact
British Library Conference Proceedings | 2016
|Precast concrete bridge continuity over piers : technical report
TIBKAT | 2020
|