A platform for research: civil engineering, architecture and urbanism
Train of jumbos handles Niagara conduit forms
Difficult concreting works on 4 mi long, 44×69 ft water conduits from Niagara intake to power plant at Lewiston, NY facilitated through use of special forms on traveling jumbos; open cut conduit is covered by reinforced concrete arch and backfilled; handling of concrete; pouring sequence.
Train of jumbos handles Niagara conduit forms
Difficult concreting works on 4 mi long, 44×69 ft water conduits from Niagara intake to power plant at Lewiston, NY facilitated through use of special forms on traveling jumbos; open cut conduit is covered by reinforced concrete arch and backfilled; handling of concrete; pouring sequence.
Train of jumbos handles Niagara conduit forms
Construction Methods Equipment
1959
5 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Online Contents | 1993
Werkseinweihung: >>Jumbos<< sind im Anmarsch
Online Contents | 1996
Back-up train for Niagara Falls/Canada
British Library Online Contents | 2006
Jumbos and Loaders busy in Sedrun at the GBT
British Library Online Contents | 2004
Will computer controlled jumbos take over at the face?
Tema Archive | 1984
|