A platform for research: civil engineering, architecture and urbanism
Tunneling 23 miles through rockies
Piercing Continental Divide to bring water to Denver; 10-ft 3-in. diam tunnel will divert water from future Dillon Dam to eastern slope of Divide; tunneling works are carried out at two ends and also at midway through two 1000-ft steep access shafts; it takes about 60 min to drill and 20 min to load 42 to 52 holes per heading using 2-platform jumbo; problems of temperature and ground water.
Tunneling 23 miles through rockies
Piercing Continental Divide to bring water to Denver; 10-ft 3-in. diam tunnel will divert water from future Dillon Dam to eastern slope of Divide; tunneling works are carried out at two ends and also at midway through two 1000-ft steep access shafts; it takes about 60 min to drill and 20 min to load 42 to 52 holes per heading using 2-platform jumbo; problems of temperature and ground water.
Tunneling 23 miles through rockies
Eng News -- Rec
Engineering News-Record ; 163
1959
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1965
|Engineering Index Backfile | 1956
|Engineering Index Backfile | 1957
|Tunneling eighteen miles in six months
Engineering Index Backfile | 1937
"Alcatraz of the Rockies" opens in Colorado
Online Contents | 1995