A platform for research: civil engineering, architecture and urbanism
New aqueduct for east bay municipal utility district
Aqueduct to be constructed for Oakland, Calif, will be 81 mi long, 87-in. ID pipe lines for 100 mgd gravity flow; 69 mi will be constructed in trench and will have earth cover of 4 ft, and 11 mi will be supported above ground on pile foundations and steel bents; cost will be about $60,000,000.
New aqueduct for east bay municipal utility district
Aqueduct to be constructed for Oakland, Calif, will be 81 mi long, 87-in. ID pipe lines for 100 mgd gravity flow; 69 mi will be constructed in trench and will have earth cover of 4 ft, and 11 mi will be supported above ground on pile foundations and steel bents; cost will be about $60,000,000.
New aqueduct for east bay municipal utility district
AWWA -- J
Trahern, J.W. (author)
1959
6 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
New Aqueduct for the East Bay Municipal Utility District
Wiley | 1959
|East bay municipal utility district
Engineering Index Backfile | 1929
|British Library Conference Proceedings | 2009
|Lafayette dam, East Bay Municipal Utility District, California
Engineering Index Backfile | 1929
Safety Program of the East Bay Municipal Utility District
Wiley | 1963
|