A platform for research: civil engineering, architecture and urbanism
`Cut and cover' job buries Titan missile base
Scrapers open up site beneath Colorado plains, near Lowry Air Force Base, for first underground missile base in United States; deep silos, to house Titan missiles and powerhouse, are dug by teams of tractor-loaders and clamshells in open cut excavation; excavation of 3 million cu yd of cemented clay and sandstone; as excavation proceeds, steel ring-beams are placed into silos; backfilling over completed work.
`Cut and cover' job buries Titan missile base
Scrapers open up site beneath Colorado plains, near Lowry Air Force Base, for first underground missile base in United States; deep silos, to house Titan missiles and powerhouse, are dug by teams of tractor-loaders and clamshells in open cut excavation; excavation of 3 million cu yd of cemented clay and sandstone; as excavation proceeds, steel ring-beams are placed into silos; backfilling over completed work.
`Cut and cover' job buries Titan missile base
Excavating Engr
Excavating Engineer ; 54
1960
5 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
COLLAPSE ON DEMOLITION SITE BURIES WORKER
British Library Online Contents | 2004
|TITAN construction for Titan missile
Engineering Index Backfile | 1961
|Tester `buries' soil 500 ft deep
Engineering Index Backfile | 1963
Simplified Tables of external loads on buries pipelines
TIBKAT | 1986
|Sea-bottom plow buries transoceanic cable
Tema Archive | 1976
|