A platform for research: civil engineering, architecture and urbanism
Piccadilly-Knightsbridge underpass
Contractors for Hyde Park Corner-Marble Arch improvement scheme, will introduce Italian ICOS-Veder process which provides support to sides of excavation for 1000-ft twin two-lane underpass before large-scale excavation begins; process involves excavation of 20-in. trench to depth of retaining wall; trench is filled with bentonite slurry and then excavated to required depth of permanent subway structure; data on five construction stages.
Piccadilly-Knightsbridge underpass
Contractors for Hyde Park Corner-Marble Arch improvement scheme, will introduce Italian ICOS-Veder process which provides support to sides of excavation for 1000-ft twin two-lane underpass before large-scale excavation begins; process involves excavation of 20-in. trench to depth of retaining wall; trench is filled with bentonite slurry and then excavated to required depth of permanent subway structure; data on five construction stages.
Piccadilly-Knightsbridge underpass
Roads Road Construction
1960
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
UB Braunschweig | 2000
|TIBKAT | 2000
|Online Contents | 1993
Terraced houses, Knightsbridge
British Library Online Contents | 1996
|Restaurant, Knightsbridge, London
British Library Online Contents | 2003
|