A platform for research: civil engineering, architecture and urbanism
Planning for mined underground LPG storage
Rock in which LPG is to be stored must be impervious, massive enough to allow excavation of cavity, structurally sound and inert so that it will not react with stored material; storage can be built for approximately $3 to $4/bbl of capacity; cumulative time taken to construct 200,000 bbl cavern is estimated at 19 mo; principal users.
Planning for mined underground LPG storage
Rock in which LPG is to be stored must be impervious, massive enough to allow excavation of cavity, structurally sound and inert so that it will not react with stored material; storage can be built for approximately $3 to $4/bbl of capacity; cumulative time taken to construct 200,000 bbl cavern is estimated at 19 mo; principal users.
Planning for mined underground LPG storage
Oil Gas J
Scisson, S.E. (author)
Oil and Gas Journal ; 58
1960
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
First Ore Mined at Mount Morgans Beresford Underground
Online Contents | 2017
CATHODIC PROTECTION OF SURFACE TO UNDERGROUND CASINGS IN LPG MINED CAVERNS STORAGE
British Library Conference Proceedings | 2016
|Building Mined Underground Stations in Soft Ground with NATM Construction Practices
British Library Conference Proceedings | 2010
|Study on Earthquake Resistance of Underground Reservoir in Mined-out Area of Mine
DOAJ | 2020
|