A platform for research: civil engineering, architecture and urbanism
Roselend hydroelectric power plant in Haute Savoie
Project comprises 150 m high Roselend buttress arch dam, 100 m high La Girotte arch dam, 187 million cu m Roselend reservoir, and Bathie underground power plant of 500 Mw capacity with 6 Pelton turbines; 18 km long 4. 5 m diam power tunnel ends in 7.5 diam steel lined 160 m high surge tank; 2.5 km long 3 m diam single steel pressure conduit of 70% gradient is most efficient installation in world.
Roselend hydroelectric power plant in Haute Savoie
Project comprises 150 m high Roselend buttress arch dam, 100 m high La Girotte arch dam, 187 million cu m Roselend reservoir, and Bathie underground power plant of 500 Mw capacity with 6 Pelton turbines; 18 km long 4. 5 m diam power tunnel ends in 7.5 diam steel lined 160 m high surge tank; 2.5 km long 3 m diam single steel pressure conduit of 70% gradient is most efficient installation in world.
Roselend hydroelectric power plant in Haute Savoie
Die Wasserkraftanlage Roseland in der Haute-Savoie
Koenigshofer, E. (author)
1961
4 pages
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
LE PONT AVAL: à Bonneville (Haute-Savoie)
Online Contents | 2010
Une infrastructure clef pour la Haute-Savoie
Online Contents | 2009
|Mesure de contraintes dans des roches tendres en Haute-Savoie
British Library Conference Proceedings | 2000
|OUVRAGE DE FRANCHISSEMENT DU BONNANT à St-Gervais (Haute-Savoie)
Online Contents | 2011
OUVRAGE DE FRANCHISSEMENT DU BONNANT - À St-Gervais (Haute-Savoie)
Online Contents | 2011