A platform for research: civil engineering, architecture and urbanism
June n 6 p 245-51: Features of project which includes 150 m high arch dam with 210 m crest length, 40 m thickness at base, and 5 m thickness at crest; power plant is located within dam structure; gated spillways in center of dam; 4 intake structures with 4.10 m diam steel lined pressure tunnels. Aug n 8 p 304-8: Construction of powerhouse and installation of 4 vertical Francis units of 80,000 kw each.
June n 6 p 245-51: Features of project which includes 150 m high arch dam with 210 m crest length, 40 m thickness at base, and 5 m thickness at crest; power plant is located within dam structure; gated spillways in center of dam; 4 intake structures with 4.10 m diam steel lined pressure tunnels. Aug n 8 p 304-8: Construction of powerhouse and installation of 4 vertical Francis units of 80,000 kw each.
Development of Monteynard on Drac (river)
Amenagement de Monteynard sur le Drac (Isere)
Dubost, R. (author)
Construction ; 15
1960
Article (Journal)
French
© Metadata Copyright Elsevier B. V. All rights reserved.
Description of Sautet dam over Drac river
Engineering Index Backfile | 1935
|Description of Sautet Dam over Drac River
Engineering Index Backfile | 1935
|Barrage dam reservoir at sautet on the Drac river
Engineering Index Backfile | 1925
|Online Contents | 1996
|The Drac-Romanche water power undertaking
Engineering Index Backfile | 1925