A platform for research: civil engineering, architecture and urbanism
History of recurring spring floods of various extent; protective measures outlined; planned construction of 26 mi long floodway around city is discussed and benefit-cost analysis given.
History of recurring spring floods of various extent; protective measures outlined; planned construction of 26 mi long floodway around city is discussed and benefit-cost analysis given.
Greater Winnipeg floodway
Eng J
Templeton, C. (author)
Engineering Journal ; 44
1961
6 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1917
|Water Supply for Greater Winnipeg
Wiley | 1955
|Engineering Index Backfile | 1944
Greater Winnipeg new water supply
Engineering Index Backfile | 1919
Engineering Index Backfile | 1956
|