A platform for research: civil engineering, architecture and urbanism
200 ft high dam has tainter-gate controlled ogee spillway that discharges into hydraulic jump-type, energy dissipator with single row of baffles and end sill; damages in concrete of stilling basin were discovered 2 yr after project became operative; evaluation of conditions that are considered to have contributed to damage.
200 ft high dam has tainter-gate controlled ogee spillway that discharges into hydraulic jump-type, energy dissipator with single row of baffles and end sill; damages in concrete of stilling basin were discovered 2 yr after project became operative; evaluation of conditions that are considered to have contributed to damage.
Stilling basin damage at Chief Joseph dam
ASCE -- Proc (J Hydraulics Div)
Gedney, R.H. (author)
1961
24 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Stilling Basin Damage at Chief Joseph Dam
ASCE | 2021
|ASCE | 2021
|Engineering Index Backfile | 1961
|ASCE | 2021
|