A platform for research: civil engineering, architecture and urbanism
Plant near Woodinville, Wash, was set up for production of 973 girders and 405 cylindrical piles by production line system for Seattle freeway; 515 ft long slab served as casting base; strands were laid and stressed for entire lengths of slab at one time, with several piles or girders made in end-to-end fashion and then separated after completion by burning strands between members; semiautomatic batch plant; concrete and forms vibrated during pours; steps in production of piles detailed.
Plant near Woodinville, Wash, was set up for production of 973 girders and 405 cylindrical piles by production line system for Seattle freeway; 515 ft long slab served as casting base; strands were laid and stressed for entire lengths of slab at one time, with several piles or girders made in end-to-end fashion and then separated after completion by burning strands between members; semiautomatic batch plant; concrete and forms vibrated during pours; steps in production of piles detailed.
Volume prestressing
Pac Bldr Engr
Nelson, P. (author)
1960
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
British Library Online Contents | 1996
|TIBKAT | 1976
|Developments in Prestressing and Use of External Prestressing
British Library Conference Proceedings | 2001
|Prestressing with arbitrary positioning of prestressing elements
Engineering Index Backfile | 1966
|British Library Online Contents | 2002
|