A platform for research: civil engineering, architecture and urbanism
Tamar bridge completed
First suspension bridge to be completed in Britain for 66 yr is 1100 ft long between towers; traffic is carried on 3-lane roadway 33 ft wide, with 6-ft wide footpath at each side; roadway is 130 ft above spring tide high water mark; in addition to central span there are 2 side spans of 374 ft, making total suspended length 1848 ft; reinforced concrete towers 250 ft high and locked coil ropes are unusual features. (see also Surveyor v 120 n 3621 Oct 28 1961 p 1285-7)
Tamar bridge completed
First suspension bridge to be completed in Britain for 66 yr is 1100 ft long between towers; traffic is carried on 3-lane roadway 33 ft wide, with 6-ft wide footpath at each side; roadway is 130 ft above spring tide high water mark; in addition to central span there are 2 side spans of 374 ft, making total suspended length 1848 ft; reinforced concrete towers 250 ft high and locked coil ropes are unusual features. (see also Surveyor v 120 n 3621 Oct 28 1961 p 1285-7)
Tamar bridge completed
Engineering
Engineering ; 192
1961
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1961
Engineering Index Backfile | 1965
|Online Contents | 1996
British Library Online Contents | 1996
British Library Online Contents | 2002
|