A platform for research: civil engineering, architecture and urbanism
Three-way prestressing builds London viaduct
Construction of 16 span 1/2 mi long 61 ft wide viaduct in congested city area by crossing 6 roads and busy railway on which traffic had to be maintained during construction; structure incorporates longitudinal, transverse, and vertical prestressing; columns rest on roller bearings; roadway has electrical heating system; main structural element is 3 compartment hollow box girder made up of precast beam segments with precast cantilever sections.
Three-way prestressing builds London viaduct
Construction of 16 span 1/2 mi long 61 ft wide viaduct in congested city area by crossing 6 roads and busy railway on which traffic had to be maintained during construction; structure incorporates longitudinal, transverse, and vertical prestressing; columns rest on roller bearings; roadway has electrical heating system; main structural element is 3 compartment hollow box girder made up of precast beam segments with precast cantilever sections.
Three-way prestressing builds London viaduct
Eng News-Rec
Engineering News-Record ; 167
1961
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1937
|Lincoln Builds First Heated Pedestrian Viaduct
Online Contents | 1994
|The Imrahor Viaduct - Turkey, External and Internal prestressing
British Library Conference Proceedings | 1996
|Hydrogen-assisted stress-corrosion of prestressing wires in a motorway viaduct
Tema Archive | 1998
|Condition Monitoring of External Prestressing Tendons on a Concrete Multi-span Highway Viaduct
Springer Verlag | 2021
|