A platform for research: civil engineering, architecture and urbanism
Construction of highway bridge over Ruhr River at Westhofen-Hagen
Prestressed concrete hollow box girder bridge has 96 m long main span and 2 side spans 72 m long each; box girder is 7.5 m wide, 3.50 m high above piers and 2.30 m high in span center; top plate of girder is widened to carry 12.75 m wide roadway; stress analysis; use of continuous falsework; methods of erection and prestressing.
Construction of highway bridge over Ruhr River at Westhofen-Hagen
Prestressed concrete hollow box girder bridge has 96 m long main span and 2 side spans 72 m long each; box girder is 7.5 m wide, 3.50 m high above piers and 2.30 m high in span center; top plate of girder is widened to carry 12.75 m wide roadway; stress analysis; use of continuous falsework; methods of erection and prestressing.
Construction of highway bridge over Ruhr River at Westhofen-Hagen
Konstruktion und Ausfuehrung der Autobahnbruecke ueber die Ruhr bei Westhofen-Hagen
Schmitz, H. (author)
Bauingenieur ; 36
1961
9 pages
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
Prestressed highway bridge over Ruhr river at Frondenberg, Germany
Engineering Index Backfile | 1954
|New plate-girder highway bridge over Ruhr River at Werden
Engineering Index Backfile | 1932
|Bridge over Ruhr River between Witten and Herbede
Engineering Index Backfile | 1929
|Highway bridge over River Leyes
Engineering Index Backfile | 1946
|