A platform for research: civil engineering, architecture and urbanism
Construction of new Hong Kong airport
Reclamation by dredging and land fill in relatively deep water in Hong Kong harbor for new 8350 ft long, 200 ft wide asphalt runway, and construction of runway and ancillary services, all completed within period of 3 yr; methods adopted to control settlements; work included construction of 13,000 ft asphalt taxiway, 3.2 mi of seawall, storm water drainage, fire mains, ducting pits and underground substation.
Construction of new Hong Kong airport
Reclamation by dredging and land fill in relatively deep water in Hong Kong harbor for new 8350 ft long, 200 ft wide asphalt runway, and construction of runway and ancillary services, all completed within period of 3 yr; methods adopted to control settlements; work included construction of 13,000 ft asphalt taxiway, 3.2 mi of seawall, storm water drainage, fire mains, ducting pits and underground substation.
Construction of new Hong Kong airport
Instn Civ Engrs -- Proc
Henry, J.K.M. (author) / Villiers, A.W.C. (author) / Gandy, J.J. (author)
1961
28 pages
5 p photographs
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Hong Kong International Airport - construction
British Library Online Contents | 1998
|Hong Kong International Airport
British Library Conference Proceedings | 1999
|Hong Kong International Airport
Online Contents | 1998
|Hong Kong International Airport railway
British Library Online Contents | 1998
|