A platform for research: civil engineering, architecture and urbanism
Development of structural system, design and construction process, for two-stage prestressed concrete three-span frame bridge with spans of 120-190-120 ft; use of precast girders in all spans, and incorporation of field post-tensioning allows long spans, light, shallow superstructure, structural efficiency of rigid frame, and economical construction process. (10125)
Development of structural system, design and construction process, for two-stage prestressed concrete three-span frame bridge with spans of 120-190-120 ft; use of precast girders in all spans, and incorporation of field post-tensioning allows long spans, light, shallow superstructure, structural efficiency of rigid frame, and economical construction process. (10125)
Yakima river bridge
J Prestressed Concr Inst
Grant, A. (author)
1968
7 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1931
Box-girder Bridge at Yakima, Wash
Engineering Index Backfile | 1939
|