A platform for research: civil engineering, architecture and urbanism
New building erected for Pripp breweries in Bromma
Store building of 17,000 sq m has basement beneath; foundation is on rock; roof is supported by beams resting on 13 m high precast columns; assembly was made prior to laying of lower floor which was compacted by means of vacuum method; hall for tapping beverages comprises 9.100 sq m and is also provided with basement; roof rests on arched girders with span of 48 m; multistory building has area section of 6.700 sq m. (30996)
New building erected for Pripp breweries in Bromma
Store building of 17,000 sq m has basement beneath; foundation is on rock; roof is supported by beams resting on 13 m high precast columns; assembly was made prior to laying of lower floor which was compacted by means of vacuum method; hall for tapping beverages comprises 9.100 sq m and is also provided with basement; roof rests on arched girders with span of 48 m; multistory building has area section of 6.700 sq m. (30996)
New building erected for Pripp breweries in Bromma
Nybyggnad for Pripp-Bryggerierna i Bromma
Westergren, G. (author)
Cement Och Betong ; 44
1969
2 pages
Article (Journal)
Swedish
© Metadata Copyright Elsevier B. V. All rights reserved.
Collapse of newly erected building
Engineering Index Backfile | 1964
|Building erected by arc welding
Engineering Index Backfile | 1929
|Second-largest concrete building erected
Engineering Index Backfile | 1917