A platform for research: civil engineering, architecture and urbanism
Trench must be custom-fitted to 60-inch prefabricated line
Construction of 34 1/2-mi-long pipe line which will carry water to city of Birmingham, Ala; steep grades, rock cuts, and stream crossings make excavation difficult; use of winches to keep heavy equipment from sliding.
Trench must be custom-fitted to 60-inch prefabricated line
Construction of 34 1/2-mi-long pipe line which will carry water to city of Birmingham, Ala; steep grades, rock cuts, and stream crossings make excavation difficult; use of winches to keep heavy equipment from sliding.
Trench must be custom-fitted to 60-inch prefabricated line
Construction Methods Equipment
1961
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Prefabricated gold millstone shallow open trench skirting line
European Patent Office | 2021
|