A platform for research: civil engineering, architecture and urbanism
Rapid tunnelling in London clay
Experimental tunneling in North London for 11.5 mi Victoria tube line; flexibly jointed cast-iron lining without bolts and with much shallower flanges than those of conventional linings are used; tunnels bored by rotary type of shield known as Drum Digger which can give rapid rates in 14 ft diam tunnel; excavation of access shafts.
Rapid tunnelling in London clay
Experimental tunneling in North London for 11.5 mi Victoria tube line; flexibly jointed cast-iron lining without bolts and with much shallower flanges than those of conventional linings are used; tunnels bored by rotary type of shield known as Drum Digger which can give rapid rates in 14 ft diam tunnel; excavation of access shafts.
Rapid tunnelling in London clay
Mine Quarry Eng
1961
6 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1961
Engineering Index Backfile | 1961
Tunnelling-induced consolidation settlements in London Clay
Online Contents | 2013
|Tunnelling-induced consolidation settlements in London Clay
British Library Online Contents | 2013
|