A platform for research: civil engineering, architecture and urbanism
Construction methods used on twin railway tunnels near Pietermaritzburg
Twin tunnels, 100 ft apart, are each 19,760 ft long; tunnels are connected by cross cuts; jumbo used and drill patterns are described; table shows detailed cycle times for rock excavation; description of "Eimco" loader and "Conway" mucker with conveyor belt system; use of special shuttering for lining; method of ventilation after blasting.
Construction methods used on twin railway tunnels near Pietermaritzburg
Twin tunnels, 100 ft apart, are each 19,760 ft long; tunnels are connected by cross cuts; jumbo used and drill patterns are described; table shows detailed cycle times for rock excavation; description of "Eimco" loader and "Conway" mucker with conveyor belt system; use of special shuttering for lining; method of ventilation after blasting.
Construction methods used on twin railway tunnels near Pietermaritzburg
Civ Engr S Africa
Schmidt, N.F.B. (author)
1961
15 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Alexandra bridge, Pietermaritzburg
Engineering Index Backfile | 1916
Rehabilitation of the Pietermaritzburg Airport
British Library Online Contents | 2012
Pietermaritzburg Airport runway lands new technology
British Library Online Contents | 2011
Pietermaritzburg: Trials and Traumas of Conservation
Online Contents | 1999
|Tunneling methods used at the railway tunnels construction in Slovak republic
DOAJ | 2007
|