A platform for research: civil engineering, architecture and urbanism
Description of construction of 2070 ft long 34 ft wide and 26 ft high horseshoe shaped tunnel of Trans-Canada Highway; tunneling works from 2 headings met with only 1/4 in. deviation; repair of 1000 cu yd of cave-in.
Description of construction of 2070 ft long 34 ft wide and 26 ft high horseshoe shaped tunnel of Trans-Canada Highway; tunneling works from 2 headings met with only 1/4 in. deviation; repair of 1000 cu yd of cave-in.
China bar tunnelers "hole through"
Eng Contract Rec
Hooker, A. (author)
1961
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
THROUGH-HOLE POSITIONING JIG AND THROUGH-HOLE POSITIONING METHOD
European Patent Office | 2021
|THROUGH-HOLE POSITIONING JIG AND THROUGH-HOLE POSITIONING METHOD
European Patent Office | 2021
|THROUGH-HOLE FORMING TOOL AND THROUGH-HOLE FORMING METHOD
European Patent Office | 2020
|THROUGH-HOLE PROTECTION UNIT AND THROUGH-HOLE PROTECTION STRUCTURE
European Patent Office | 2017
|THROUGH HOLE COVER, AND CYLINDRICAL INSTALLATION STRUCTURE TO THROUGH HOLE
European Patent Office | 2021
|