A platform for research: civil engineering, architecture and urbanism
Compacted earth fill for power-plant foundation
Construction of foundations for 142,000 kw Unit 1, of Chula Vista, Calif power plant; because soil was soft and bedrock was at depth of 210 ft, compacted fill method was selected to support 100 by 240 ft foundation slab; soil was excavated to 10 ft depth and backfilled with carefully compacted dune sand; excavation by scraper; fill specifications; data on vibratory compaction and settlement; costs were 2/3 less than that of pile foundation.
Compacted earth fill for power-plant foundation
Construction of foundations for 142,000 kw Unit 1, of Chula Vista, Calif power plant; because soil was soft and bedrock was at depth of 210 ft, compacted fill method was selected to support 100 by 240 ft foundation slab; soil was excavated to 10 ft depth and backfilled with carefully compacted dune sand; excavation by scraper; fill specifications; data on vibratory compaction and settlement; costs were 2/3 less than that of pile foundation.
Compacted earth fill for power-plant foundation
Civ Eng (NY)
Smoots, V.A. (author) / Benton, P.H. (author)
1961
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Strength of compacted earth fill
Automotive engineering | 1990
|Field control of compacted earth fill
Engineering Index Backfile | 1939
|Compacted earth fill dam for maritime hydro project
Engineering Index Backfile | 1953
|Compacted earth fill dam for maritime hydro project
Engineering Index Backfile | 1953
|Cone Resistance of Compacted Ash Fill
British Library Online Contents | 2004
|