A platform for research: civil engineering, architecture and urbanism
Replacement of 200 ft length of deteriorated and leaking old 9 ft diam brick masonry sewer, built with steel plate supported top arch, at Chelsea, Mass; excavation of whole length of sewer section and application of double row of 40-ft Z sheet piling along both sides; wellpoint control of groundwater flow; use of 96 in. reinforced concrete pipe for replacement; remaining part of old brick sewer was connected with new section by stop log chamber.
Replacement of 200 ft length of deteriorated and leaking old 9 ft diam brick masonry sewer, built with steel plate supported top arch, at Chelsea, Mass; excavation of whole length of sewer section and application of double row of 40-ft Z sheet piling along both sides; wellpoint control of groundwater flow; use of 96 in. reinforced concrete pipe for replacement; remaining part of old brick sewer was connected with new section by stop log chamber.
Repairs to Chelsea Sewer
Water Pollution Control Federation -- J
Henderson, P.P. (author)
1961
7 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Winter repairs to leaking sewer
Engineering Index Backfile | 1945
|Localised sewer repairs in Northumbrian Water
British Library Conference Proceedings | 1992
|Eliat, Israel, benefits from timely sewer repairs
Online Contents | 1998
The multi-faceted use of robots in sewer repairs
Online Contents | 1994
|