A platform for research: civil engineering, architecture and urbanism
Construction of usual Atlas missile launching complexes at Abilene, Tex; description of excavation methods for silos; open cut method was applied to 35 ft depth; from here, down to 180 ft depth, method of sinking of vertical shaft was applied; problems of sinking large 60 ft diam shaft; detailed description of hole drilling, controlled blasting, and explosives used.
Construction of usual Atlas missile launching complexes at Abilene, Tex; description of excavation methods for silos; open cut method was applied to 35 ft depth; from here, down to 180 ft depth, method of sinking of vertical shaft was applied; problems of sinking large 60 ft diam shaft; detailed description of hole drilling, controlled blasting, and explosives used.
Texas bases for Atlas ICBM
Explosives Engr
Houck, L.H. (author)
Explosives Engineer ; 39
1961
8 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Water supplies for Titan ICBM bases
Engineering Index Backfile | 1963
|Water Supplies for Titan ICBM Bases
ASCE | 2021
|Discussion of “Water Supplies for Titan ICBM Bases”
ASCE | 2021
|Closure to “Water Supplies for Titan ICBM Bases”
ASCE | 2021
|Engineering Index Backfile | 1959
|