A platform for research: civil engineering, architecture and urbanism
Design data of building completed Sept 1961, and occupied by engineering societies; all welded steel frame building in New York City occupies 37,000 sq ft and is 20 stories high; exterior is 6 ft high continuous row of glass alternating with rows of 6 ft high Spandrelite; integrated ventilation, heating and air conditioning systems are under precise temperature control by "By-pass weather-master" units.
Design data of building completed Sept 1961, and occupied by engineering societies; all welded steel frame building in New York City occupies 37,000 sq ft and is 20 stories high; exterior is 6 ft high continuous row of glass alternating with rows of 6 ft high Spandrelite; integrated ventilation, heating and air conditioning systems are under precise temperature control by "By-pass weather-master" units.
United engineering center
Civ Eng (NY)
Hunt, H.W. (author)
1961
7 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1960
|British Library Online Contents | 2010
|Engineering an Entertainment Center
British Library Online Contents | 2002
|Lumen United Reform Church and Community Center
Online Contents | 2009
Productivity Center for Wastewater Engineering
British Library Online Contents | 1998