A platform for research: civil engineering, architecture and urbanism
Shallow gas well completion methods, Edmonton district
Methods of open hole and casing completions; to decide which method to use, characteristics of producing formation must be considered; if this formation is known to be competent, to have poor vertical permeability, and is such that it will not be adversely affected by water, it is usually advantageous to set casing at top of sand.
Shallow gas well completion methods, Edmonton district
Methods of open hole and casing completions; to decide which method to use, characteristics of producing formation must be considered; if this formation is known to be competent, to have poor vertical permeability, and is such that it will not be adversely affected by water, it is usually advantageous to set casing at top of sand.
Shallow gas well completion methods, Edmonton district
Can Min Met Bul
Byers, W.F. (author)
1960
5 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Online Contents | 1978
Shallow groundwater combined well structure and well completion construction method thereof
European Patent Office | 2020
|British Library Online Contents | 2016
|Springer Verlag | 2021
|Universitätsbibliothek Edmonton, CDN
Online Contents | 1975
|