A platform for research: civil engineering, architecture and urbanism
Self-supporting arch spans 150-foot canal
Self-supporting pipe arch of 2 16-in. lines was erected in 12 hr; 2 sections of 150 ft span were shop-fabricated, hauled to site where foundations anchored in bed rock had previously been poured; twin base plates at lower end of each section were fitted over circles of anchor bolts, and then, with each section tangentially loaded to simulate final compressive loads of structure, tie-in was made; materials, fabrication and testing of arch.
Self-supporting arch spans 150-foot canal
Self-supporting pipe arch of 2 16-in. lines was erected in 12 hr; 2 sections of 150 ft span were shop-fabricated, hauled to site where foundations anchored in bed rock had previously been poured; twin base plates at lower end of each section were fitted over circles of anchor bolts, and then, with each section tangentially loaded to simulate final compressive loads of structure, tie-in was made; materials, fabrication and testing of arch.
Self-supporting arch spans 150-foot canal
Pipe Line Industry
Donnelly, W.H. (author) / McMullin, E.V. (author)
Pipe Line Industry ; 15
1961
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
High-level Arch Bridge spans Panama Canal
Engineering Index Backfile | 1962
Concrete arch bridge of three 250-foot spans
Engineering Index Backfile | 1921
|Engineering Index Backfile | 1950
|Prestressed concrete arch spans 353 ft
Engineering Index Backfile | 1950
|Record three-hinged arch spans 278 ft
Engineering Index Backfile | 1954