A platform for research: civil engineering, architecture and urbanism
On Erie, extensive tunnels stabilize wet fill
On River Line of Erie near Fillmore, NY, track settlement and embankment slippage were stopped when old concrete arch culvert under 90 ft fill was replaced by 98-in. liner plate pipe, and tunneled in place at elevation 20 ft lower; installation also includes collecting chamber and two 48 in. branch tunnels.
On Erie, extensive tunnels stabilize wet fill
On River Line of Erie near Fillmore, NY, track settlement and embankment slippage were stopped when old concrete arch culvert under 90 ft fill was replaced by 98-in. liner plate pipe, and tunneled in place at elevation 20 ft lower; installation also includes collecting chamber and two 48 in. branch tunnels.
On Erie, extensive tunnels stabilize wet fill
Ry Track Structures
1953
3 pages
Topographical plan
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
How erickson uses vertical sand drains to stabilize foundation for fill
Engineering Index Backfile | 1945
Construction of hydraulic-fill foundations for sunken-tube tunnels
Springer Verlag | 1978
|Construction of hydraulic-fill foundations for sunken-tube tunnels
Online Contents | 1978
|Long tunnels make extensive dip workings self-draining
Engineering Index Backfile | 1925
|Evaluation of the Use of Submerged Prefabricated Structures to Stabilize a Beach Fill
British Library Conference Proceedings | 2007
|