A platform for research: civil engineering, architecture and urbanism
Prestressed concrete railway and conveyor bridge
74-ft span combined railway and conveyor bridge constructed in connection with modern coal mine at Calverton, Nottinghamshire; bridge has two precast, prestressed girders 77 ft long placed at 16 ft 8 in. centers; bridge contains, on its upper deck 17 ft 10 in. railroad and two foot paths and lower deck contains two conveyor belts; loading test.
Prestressed concrete railway and conveyor bridge
74-ft span combined railway and conveyor bridge constructed in connection with modern coal mine at Calverton, Nottinghamshire; bridge has two precast, prestressed girders 77 ft long placed at 16 ft 8 in. centers; bridge contains, on its upper deck 17 ft 10 in. railroad and two foot paths and lower deck contains two conveyor belts; loading test.
Prestressed concrete railway and conveyor bridge
Surveyor
1953
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Prestressed concrete railway bridge
Engineering Index Backfile | 1953
|Prestressed concrete railway bridge
Engineering Index Backfile | 1954
Prestressed concrete railway bridge
Engineering Index Backfile | 1952
Prestressed concrete bridge on steelworks railway
Engineering Index Backfile | 1953
Vibration tests on prestressed concrete railway bridge
Engineering Index Backfile | 1965
|