A platform for research: civil engineering, architecture and urbanism
Adequate lighting prominent feature of Vancouver's Burrard St. Bridge
Bridge lighting is provided with eighty-two 600-cp 20-a bronze " Paragon" units, 6 streethoods (600 cp) and four 1500 cp braziers; these include 68 units mounted on specially designed concrete columns spaced at 90 ft intervals on parapet walls, 8 brackets, and 6 streethoods attached to steel work of main span.
Adequate lighting prominent feature of Vancouver's Burrard St. Bridge
Bridge lighting is provided with eighty-two 600-cp 20-a bronze " Paragon" units, 6 streethoods (600 cp) and four 1500 cp braziers; these include 68 units mounted on specially designed concrete columns spaced at 90 ft intervals on parapet walls, 8 brackets, and 6 streethoods attached to steel work of main span.
Adequate lighting prominent feature of Vancouver's Burrard St. Bridge
Elec News
1932
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Management of Dredged Material in Burrard Inlet
British Library Conference Proceedings | 1993
|Vancouver's suburban involution
Online Contents | 2014
|Vancouver's suburban involution
Taylor & Francis Verlag | 2014
|Vancouver's Sea Island Airport
Engineering Index Backfile | 1940
|