A platform for research: civil engineering, architecture and urbanism
Shift 90-ft.tower between trains in viaduct renewal
Unique replacement procedure adopted by Nickel Plate Co at State Line, Pa, to permit new columns to rest on old pedestals; mortar cap over cover plates evens up girder flanges to receive precast floor slabs.
Shift 90-ft.tower between trains in viaduct renewal
Unique replacement procedure adopted by Nickel Plate Co at State Line, Pa, to permit new columns to rest on old pedestals; mortar cap over cover plates evens up girder flanges to receive precast floor slabs.
Shift 90-ft.tower between trains in viaduct renewal
Ry Age
Railway Age ; 100
1936
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
British Library Conference Proceedings | 2002
|Local Vibration Properties of RC Viaduct under Passing Trains
Tema Archive | 2012
|Dynamic interaction of high-speed monorails trains and viaduct structures
British Library Conference Proceedings | 2005
|Infrastructure News - Leicester Relock; Loughor viaduct renewal;Tanners Hill doubling
Online Contents | 2013