A platform for research: civil engineering, architecture and urbanism
Chicago's sewer tunnels
Construction of Southwest intercepting sewer, 12.4 mi long, designed for maximum storm flow of over 600 mgd; tunneling procedure; concrete lining; concrete specifications; concrete handling; concreting in compressed air; hand labor judiciously used; safety regulations; unusual cofferdam.
Chicago's sewer tunnels
Construction of Southwest intercepting sewer, 12.4 mi long, designed for maximum storm flow of over 600 mgd; tunneling procedure; concrete lining; concrete specifications; concrete handling; concreting in compressed air; hand labor judiciously used; safety regulations; unusual cofferdam.
Chicago's sewer tunnels
Eng News-Rec
Engineering News-Record ; 117
1936
6 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1916
Chicago's sewer construction program
Engineering Index Backfile | 1946
|Chicago's standard of sewer construction
Engineering Index Backfile | 1919
|Chicago's tunnels for electric light and power cables
Engineering Index Backfile | 1919
|Forty feet below: The story of Chicago's freight tunnels
Elsevier | 1983