A platform for research: civil engineering, architecture and urbanism
Engineering features of refuse incinerator having two furnaces with total capacity of 150 tons per 24 hr, costing $119,000; features of building and furnaces; results of tests.
Engineering features of refuse incinerator having two furnaces with total capacity of 150 tons per 24 hr, costing $119,000; features of building and furnaces; results of tests.
New Central incinerator at Columbus, Ohio
Am City
Ramsey, E.A. (author)
American City ; 51
1936
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
UB Braunschweig | 1931
|Insurer revives Columbus, Ohio
British Library Online Contents | 2000
Refuse collection in Columbus, Ohio
Engineering Index Backfile | 1912
|Airport at port Columbus, Ohio
Engineering Index Backfile | 1929
|