A platform for research: civil engineering, architecture and urbanism
Precast concrete cylinders support new wharf
Unusual combination of concrete cylinders, 9 ft in diam and 55 to 70 ft long, and timber piling used in reconstruction of berths at Saint John Harbor, N B; substructure of wharf consists of transverse bents, 20 ft c, to c., made up of two cylinders and two pile clusters; cylinders cast in drydock; caisson sinking; ground movement; low-tide operations; bulkhead construction troubles; work to cost $2,750,000.
Precast concrete cylinders support new wharf
Unusual combination of concrete cylinders, 9 ft in diam and 55 to 70 ft long, and timber piling used in reconstruction of berths at Saint John Harbor, N B; substructure of wharf consists of transverse bents, 20 ft c, to c., made up of two cylinders and two pile clusters; cylinders cast in drydock; caisson sinking; ground movement; low-tide operations; bulkhead construction troubles; work to cost $2,750,000.
Precast concrete cylinders support new wharf
Eng News-Rec
Engineering News-Record ; 117
1936
5 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Precast cylinders support new Wharf
Engineering Index Backfile | 1939
Precast concrete in Canal zone wharf
Engineering Index Backfile | 1936
|Precast concrete panels: Imperial Wharf and The Bodleian's Book Storae Facility
British Library Online Contents | 2011
Case studies on precast prestressed concrete spun piles for wharf structures
British Library Online Contents | 2010
Precast at its best - Timber Wharf, Manchester
British Library Online Contents | 2003
|