Construction and testing of twin underground concrete penstocks for Mareges power plant, 4.4 m to 6.2 m in diam; downstream end, designed as above ground structure is reinforced with 6-strand cables, and anchored at bottom and prestressed by hydraulic jacks pushing cable outwards along horizontal diameter. (see also English abstract in Civ Eng (Lond) v 31 n 362 Aug 1936 p 257)
Construction and testing of twin underground concrete penstocks for Mareges power plant, 4.4 m to 6.2 m in diam; downstream end, designed as above ground structure is reinforced with 6-strand cables, and anchored at bottom and prestressed by hydraulic jacks pushing cable outwards along horizontal diameter. (see also English abstract in Civ Eng (Lond) v 31 n 362 Aug 1936 p 257)
Le frettage des condulites forcees de l'usine hydroe lectrique de Mareges
Le frettage des condulites forcees de l'usine hydroe lectrique de Mareges
Mary (author)
1936
53 pages
Article (Journal)
French
© Metadata Copyright Elsevier B. V. All rights reserved.
Le frettage des condulites forcees de l'usine hydroe lectrique de Mareges
Engineering Index Backfile | 1936
|Engineering Index Backfile | 1932
|Engineering Index Backfile | 1945
|Die Talsperre von Mareges an der Dordogne
Engineering Index Backfile | 1935
|Die Talsperre von Mareges an der Dordogne
Engineering Index Backfile | 1934
|