A platform for research: civil engineering, architecture and urbanism
Method represents new development in construction of concrete floors from prefabricated parts; arrangement eliminates all concreting on structure itself and all supports during erection other than arrangements necessary for assembling hollow girders in position.
Method represents new development in construction of concrete floors from prefabricated parts; arrangement eliminates all concreting on structure itself and all supports during erection other than arrangements necessary for assembling hollow girders in position.
Hollow-girder floors
Engineering
von Emperger, F. (author)
Engineering ; 141
1936
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Model Calculation for Precast Concrete Floors (Lattice Girder Floors)
British Library Online Contents | 1997
|Müller - Model Calculation for Precast Concrete Floors (Lattice Girder Floors)
Online Contents | 1997
Solid floors for through girder span
Engineering Index Backfile | 1916
Analytical tests of beam and girder floors
Engineering Index Backfile | 1912
Frequency analysis of beam and girder floors
Engineering Index Backfile | 1950
|