A platform for research: civil engineering, architecture and urbanism
Construction of straight concrete, gravity dam 1850 ft long and 232 ft high at Grafton, W Va, to control floods on upper Ohio River.
Construction of straight concrete, gravity dam 1850 ft long and 232 ft high at Grafton, W Va, to control floods on upper Ohio River.
Tygart river reservoir dam
Military Engr
Potter, W.E. (author)
Military Engineer ; 28
1936
5 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Correction of Spillway Deficiency at Tygart Dam
British Library Conference Proceedings | 1997
|Measuring bed rock action under Tygart dam
Engineering Index Backfile | 1936
|Engineering Index Backfile | 1936
|Tygart River reservoir project
Engineering Index Backfile | 1935
|Controlling reservoir sedimentation in Sengguruh Reservoir, Brantas River Basin
British Library Conference Proceedings | 1995
|