A platform for research: civil engineering, architecture and urbanism
Formulas for computing mass concrete for Morris dam
Mathematical method of computing volume of concrete placed in construction of partly straight and partly curved concrete-gravity dam.
Formulas for computing mass concrete for Morris dam
Mathematical method of computing volume of concrete placed in construction of partly straight and partly curved concrete-gravity dam.
Formulas for computing mass concrete for Morris dam
Civ Eng (NY)
Allin, R.W. (author)
1936
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
William Morris and Morris & Co
TIBKAT | 2003
|Concrete production and control at Mount Morris dam
Engineering Index Backfile | 1949
Online Contents | 2008
|Engineering Index Backfile | 1935
|