A platform for research: civil engineering, architecture and urbanism
Bonneville main dam. II -- Concreting Technique
Design and construction methods and laboratory and field technique for handling 600,000 cu yd of concrete in construction of Bonneville concrete-gravity dam; features of timber-crib cofferdam, foundation grouting and gates; costs and equipment; review of materials, mixing plant and placing; design of mixes and laboratory testing procedure; inspection organization. (See also - I -- Construction Procedure Reviewed, B. E. TORPEN)
Bonneville main dam. II -- Concreting Technique
Design and construction methods and laboratory and field technique for handling 600,000 cu yd of concrete in construction of Bonneville concrete-gravity dam; features of timber-crib cofferdam, foundation grouting and gates; costs and equipment; review of materials, mixing plant and placing; design of mixes and laboratory testing procedure; inspection organization. (See also - I -- Construction Procedure Reviewed, B. E. TORPEN)
Bonneville main dam. II -- Concreting Technique
Western Construction News
Burks, I.E. (author)
1936
7 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Online Contents | 1986