A platform for research: civil engineering, architecture and urbanism
Study of foundation conditions under concrete-gravity dam at Madden Lake, Panama Canal Zone; stripping of foundation; drilling for foundation grouting; grouting.
Study of foundation conditions under concrete-gravity dam at Madden Lake, Panama Canal Zone; stripping of foundation; drilling for foundation grouting; grouting.
Foundations for Madden dam
Military Engr
Klotz, R.L. (author)
Military Engineer ; 27
1935
8 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1936
|Engineering Index Backfile | 1934
|Engineering Index Backfile | 1931
|Madden dam concrete temperatures
Engineering Index Backfile | 1937
|Engineering Index Backfile | 1931
|