A platform for research: civil engineering, architecture and urbanism
Construction details of highest reinforced-concrete chimney in world, now serving copper and lead departments of smelter of American Smelting and Refining Co; 490 ft high and 30 ft inside diam at top; principal specifications; water-cement ratios and aggregates ratios, for foundation, lower shell and upper shell; cost about $75,000.
Construction details of highest reinforced-concrete chimney in world, now serving copper and lead departments of smelter of American Smelting and Refining Co; 490 ft high and 30 ft inside diam at top; principal specifications; water-cement ratios and aggregates ratios, for foundation, lower shell and upper shell; cost about $75,000.
Concrete chimney at San Luis Potosi smelter
Min J (Phoenix, Ariz)
Plass, L. (author)
1936
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
A tall concrete smelter chimney
Engineering Index Backfile | 1908
Master plan - San Luis Potosi, Mexico
Online Contents | 2008
Valeo Electrical Systems, San Luis Potosi, Mexico
British Library Online Contents | 1998
|Water Quality Management in San Luis Potosi, Mexico
Springer Verlag | 2019
|Water Management in San Luis Potosi Metropolitan Area, Mexico
Online Contents | 2010
|